Sur cette page, vous pouvez obtenir une analyse détaillée d'un mot ou d'une phrase, réalisée à l'aide de la meilleure technologie d'intelligence artificielle à ce jour:
ألاسم
تَهَاوُن
الفعل
أَصْغَرَ ; اِحْتَقَرَ ; اِسْتَحْقَرَ ; اِسْتَخَفَّ بِـ ; اِسْتَصْغَرَ ; اِسْتَقَلَّ ; تَهَاوَنَ ; حَقَرَ ; حَقَّرَ ; صَغَّرَ ; غَضَّ مِنْ ; قَلَّلَ من شَأْنِهِ أو أَهَمِّيَّتِهِ ; وَضَعَ ; وَضَعَ مِنْ
A cost overrun, also known as a cost increase or budget overrun, involves unexpected incurred costs. When these costs are in excess of budgeted amounts due to a value engineering underestimation of the actual cost during budgeting, they are known by these terms.
Cost overruns are common in infrastructure, building, and technology projects. For IT projects, a 2004 industry study by the Standish Group found an average cost overrun of 43 percent; 71 percent of projects came in over budget, exceeded time estimates, and had estimated too narrow a scope; and total waste was estimated at $55 billion per year in the US alone.
Many major construction projects have incurred cost overruns; cost estimates used to decide whether important transportation infrastructure should be built can mislead grossly and systematically.
Cost overrun is distinguished from cost escalation, which is an anticipated growth in a budgeted cost due to factors such as inflation.